Modular Plant
We will convert your technology into a modular plant.
Leveraging our extensive expertise in plant engineering and operation, we convert your technology into a modular plant. Our plant can be quickly assembled and put into operation anywhere in the world.
Addressing the current challenges in market
Modularization helps to mitigate the schedule delay and the construction risks through reduction of site manhours. Our expertise and know-how cover all aspects of modularization from design to onsite integration. We assist our clients in defining the strategy that best fits their project needs, offering extensive experience in working with yards.
Modular design for improvements in time efficiency, cost savings, and reliability.
Building on our experience in engineering and operation, we can convert your technology to the modular plants to meet your today’s challenges. These plants provide the best solution for our clients’ varied needs, offering:
-
Quick time-to-solution achieved through extensive prefabrication and pre-testing.
​
-
Streamlined on-site logistics and reduced CAPEX due to modular design.
-
Expedited equipment fabrication and delivery.
​
-
Cutting-edge technology and design for dependable operation.
​​
-
Simplified maintenance for reduced OPEX.
​
-
Comprehensive support services, from consulting to commissioning and start-up.
​​
-
Confidence assured by our strong commitment to and proven excellence in quality, health, safety, and environmental (QHSE) protection.
​
Modularization expertise
Our modularization expertise starts from the early project phases.
1. Identify constraints
2. Modularization level
3. Modularization plan
4. Screen of suitable yards
5. Fabrication plan
6. Conceptual module design
7. Yard selection
8. RFQ
9. Detailed module design
10. Fabrication
11. Control assembly
12. Transportation
Modularization advantages:
1. Construction:
-
Requirement of skilled /costly manpower on site will be reduced
-
Mitigate harsh climatic conditions
-
Controlled fabrication environment
-
Limit interfaces
-
Reduce site congestion
-
Reduced construction team
​​
2. Reduced site cost:
-
Construction manhours
-
Flatten peak manpower
-
construction equipment
-
Site supervision
-
Decreased camp size and other associated facilities.
3. Quality:
-
Reliable QHSE management
-
Higher and better controlled productivity
-
Easier monitoring of progress and work fronts
-
Module precommissioning